All states › Arizona › Electrical equipment › Chandler
AZ-006 · Tier 2 · Opportunity A
Intel Ocotillo Campus
Chandler fab campus (Fab 52), Chandler, Arizona. 18A-node processors at Fab 52.
ATier 2ProcessRamping up
- Parent
- Intel
- Industry
- Semiconductors (logic chips)
- People
- 6,300 (IndustrySelect table; text says 11,300)
- Status
- Ramping up - Fab 52 in full production (Jun 2026)
- Source
- hoodline.com ↗
- Verified
- 2026-10-16
How tools get used here
Maintenance-driven MRO: pumps, valves, motors, conveyors and shutdown or turnaround work.
Buying signals
Fab 52 began operations Oct 2025 and reached full production; ~$32B campus.
Who buys tools here
Usually the maintenance manager, plant manager, MRO or indirect purchasing, and the tool crib lead.
Plants nearby
Straight-line distance between ZIP code areas, so treat it as approximate.
All plants within 50 miMap them